Day 65- French Doors & Back Garage Door Installed, Front Porch Poured Posted on 12.05.13 by wnm9999 0 [10/17/13]
Day 63- Soffits, Fireplace Framed, Pocket Doors Installed, Siding Started Posted on 12.05.13 by wnm9999 0 [10/15/13]
Day 56-60: Front Porch, Driveway, House Wrapped, Dormers & Tar Paper on Roof Posted on 12.05.13 by wnm9999 0 [10/8/13] Porch Roof & More Plywood Siding [10/9/13] Driveway & [10/10/13) House Wrapped [10/11/13] Dormers & [10/12/13] Tar Paper on Roof
Day 55- Roof Trusses (and free porch) Posted on 12.05.13 by wnm9999 0 [10/7/13] We stopped by the house this day and realized that they had framed the porch that we had taken out the plans. At least there was one good thing that happened during the build…
Day 49- Basement Stairs, Subfloor & I-Joists Completed Posted on 12.05.13 by wnm9999 0 [10/1/13] This was the first time we were able to walk to the basement as the subfloor and basement stairs were finished