Day 41 & 42- Basement Floor & Garage Poured, Concrete Cut Posted on 12.05.13 by wnm9999 0 [9/23/13 & 9/24/13]
Day 22- Electric Poles, Driveway and Septic Excavated & Sand in Garage Posted on 12.04.13 by wnm9999 0 [9/4/13]
Day 16 & 17- Tar Put on Foundation & Window Wells Posted on 12.04.13 by wnm9999 0 [8/29/13] [8/30/13]